Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:("Date échéance")

Document Type [dt]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Discipline (document) [di]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Language

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Author Country

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 25 of 719

  • Page / 29
Export

Selection :

  • and

On the assignment of optimal due datesBAKER, K. R; SCUDDER, G. D.The Journal of the Operational Research Society. 1989, Vol 40, Num 1, pp 93-95, issn 0160-5682, 3 p.Article

A note on Schedule of n jobs on two identical machines to minimize weighted mean flow timeWEBSTER, S.Computers & industrial engineering. 1994, Vol 26, Num 4, pp 795-796, issn 0360-8352Article

On the multiple-machine extension to a common due-date assignment and scheduling problemPRABUDDHA DE; GHOSH, J. B; WELLS, C. E et al.The Journal of the Operational Research Society. 1991, Vol 42, Num 5, pp 419-422, issn 0160-5682Article

Optimal comment due-date withlimited completion timeDICKMAN, B; WILAMOWSKY, Y; EPSTEIN, S et al.Computers & operations research. 1991, Vol 18, Num 1, pp 125-127, issn 0305-0548Article

JOB SHOP SCHEDULING WITH DUE DATES AND OPERATION OVERLAP FEASIBILITY.HOLLOWAY CA; NELSON RT.1975; A.I.I.E. TRANS.; U.S.A.; DA. 1975; VOL. 7; NO 1; PP. 16-20; BIBL. 6 REF.Article

Note: due-date assignment to multi-job customer ordersBAGCHI, U; JULIEN, F. M; MAGAZINE, M. J et al.Management science. 1994, Vol 40, Num 10, pp 1389-1392, issn 0025-1909Article

Scheduling under the due date criterion with varying penalties for latenessPAPPIS, C. P; ADAMOPOULOS, G. I.Yugoslav journal of operations research. 1993, Vol 3, Num 2, pp 189-198, issn 0354-0243Article

Optimal assignment of total-work-content due-dates and sequencing in a single-machine shopCHENG, T. C. E.The Journal of the Operational Research Society. 1991, Vol 42, Num 2, pp 177-181, issn 0160-5682Article

Optimal constant due-date determination and sequencing of n jobs on a single machineCHENG, T. C. E.International journal of production economics. 1991, Vol 22, Num 3, pp 259-261Article

Optimal due date determination and sequencing of n jobs on a single machine using the SLK methodKARACAPILIDIS, N. I; PAPPIS, C. P.Computers in industry. 1993, Vol 21, Num 3, pp 335-339, issn 0166-3615Article

A two-phased approach to setting due-dates in single machine job shopsVERAL, E. A; MOHAN, R. P.Computers & industrial engineering. 1999, Vol 36, Num 1, pp 201-218, issn 0360-8352Article

A network flow approach to optimal slack due-date determinationQUADDUS, M. A.Engineering costs and production economics. 1990, Vol 18, Num 3, pp 265-267, issn 0167-188XArticle

Multi-objective scheduling with fuzzy due-dateMURATA, T; GEN, M; ISHIBUCHI, H et al.Computers & industrial engineering. 1998, Vol 35, Num 3-4, pp 439-442, issn 0360-8352Conference Paper

DUE DATES IN JOB SHOP SCHEDULING.EILON S; CHOWDHURY IG.1976; INTERNATION. J. PRODUCT. RES.; G.B.; DA. 1976; VOL. 14; NO 2; PP. 223-237; ABS. ALLEM. FR.; BIBL. 8 REF.Article

Negotiating due-dates between customers and producersLAWRENCE, S. R.International journal of production economics. 1994, Vol 37, Num 1, pp 127-138, issn 0925-5273Article

Some remarks on the decomposition properties of the single machine total tardiness problemSZWARC, Wlodzimierz.European journal of operational research. 2007, Vol 177, Num 1, pp 623-625, issn 0377-2217, 3 p.Article

An algorithm for the N/M/paralel/Cmax preemptive due-date scheduling problemCHENG, T. C. E; SIN, C. C. S.Engineering costs and production economics. 1991, Vol 21, Num 1, pp 43-49, issn 0167-188XArticle

CON due-date determination and sequencingPRABUDDHA DE; GHOSH, J. B; WELLS, C. E et al.Computers & operations research. 1990, Vol 17, Num 4, pp 333-342, issn 0305-0548, 10 p.Article

A note on optimal assignment of slack due-dates in single-machine schedulingGORDON, V. S.European journal of operational research. 1993, Vol 70, Num 3, pp 311-315, issn 0377-2217Article

Optimal assignment of slack due-dates and sequencing of jobs with random processing times on a single machineCHENG, T. C. E.European journal of operational research. 1991, Vol 51, Num 3, pp 348-353, issn 0377-2217Article

A heuristic for common due-date assignment and job scheduling on parallel machinesCHENG, T. C. E.The Journal of the Operational Research Society. 1989, Vol 40, Num 12, pp 1129-1135, issn 0160-5682Article

Note on scheduling with general learning curves to minimize the number of tardy jobsMOSHEIOV, G; SIDNEY, J. B.The Journal of the Operational Research Society. 2005, Vol 56, Num 1, pp 110-112, issn 0160-5682, 3 p.Article

An improved heuristic for the single-machine, weighted-tardiness problemHOLSENBACK, J. E; RUSSELL, R. M; MARKLAND, R. E et al.Omega (Oxford). 1999, Vol 27, Num 4, pp 485-495, issn 0305-0483Article

Scheduling in job shops with machine breakdowns : an experimental studyHOLTHAUS, O.Computers & industrial engineering. 1999, Vol 36, Num 1, pp 137-162, issn 0360-8352Article

On the complexity of two-machine flowshop problems with due date related objectivesKOULAMAS, C.European journal of operational research. 1998, Vol 106, Num 1, pp 95-100, issn 0377-2217Article

  • Page / 29